	<title>Mitton ElectroNet Consulting Electrical Engineers Christchurch NZ &#187; Substations</title>
	<atom:link href="http://www.mittonelectronet.com/category/case-studies/substations/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.mittonelectronet.com</link>
	<description></description>
	<lastBuildDate>Thu, 03 May 2012 23:37:59 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Mobile Substation Design</title>
		<link>http://www.mittonelectronet.com/2012/04/mobile-substation-design/</link>
		<comments>http://www.mittonelectronet.com/2012/04/mobile-substation-design/#comments</comments>
		<pubDate>Tue, 03 Apr 2012 14:11:30 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Substations]]></category>

		<guid isPermaLink="false">http://www.webmatters.net.nz/mitton/?p=342</guid>
		<description><![CDATA[Delta Utility Services engaged Mitton Electronet Ltd to design a fully functional Mobile 66/33 &#038; 11/6.6 kV 5 MVA Substation. Mitton Electronet was chosen due to our complete design and project management services for the design and construction of high voltage substations.]]></description>
			<content:encoded><![CDATA[<h4>Delta Utility Services engaged Mitton Electronet Ltd to design a fully functional Mobile 66/33 &amp; 11/6.6 kV 5 MVA Substation. Mitton Electronet was chosen due to our complete design and project management services for the design and construction of high voltage substations.</h4>
<h2>Project Overview &amp; Design</h2>
<p>Mitton ElectroNet developed a technologically advanced mobile substation design based on a design that had successfully been used for a 33kV unit in Greymouth. Mitton ElectroNet also provided procurement and project management services for this project.</p>
<p>The mobile substation features one 66 kV SF6 incoming breaker, one multi ratio 66-33 / 11-6.6 kV, 5 MVA, Midel 7131 filled transformer with OLTC one 11 kV vacuum feeder breaker, one local service transformer with back-up petrol generator, transformer protection and AVR Topcat RTU and SCADA via VHF radio and 48 V batteries and charger.</p>
<h2>Added Value</h2>
<p>The mobile substation enables the Client to provide a rapid response to transformer failure at any substation throughout their network. The mobile substation will also be used to facilitate transformer maintenance<br />
at small, single transformer substations where total outages are no longer acceptable due to load profile changes.</p>
<p>The use of biodegradable, Midel 7131 transformer oil in the main transformer results in an environmentally<br />
safe unit that does not require extensive bunding on the trailer or the ground when being deployed.</p>
<h2>Project Outcome</h2>
<p>Mitton ElectroNet Ltd delivered a new fully mobile 66/33/11/6.6 kV substation to Cromwell Substation for Delta Utility Services.</p>]]></content:encoded>